Skotos Forums  

Go Back   Skotos Forums

Kneller Kneller is offline

TEC Staff

About Me

  • Signature
    Active Projects:
    • Priorities
      1. Bug fixes
      2. Fixes for existing hunting grounds/NPCs (ongoing)
      3. Basran Hill story, eventual lead to ToH.
    • Side projects
      1. Malezzerai (90%: dialogue and final testing required.)
      2. Armour Rebalancing (ongoing)
      3. Assisting org/event GMs with lore consistency and coding support.
      4. Additions to Monlon (TBA), Blackvine (after Monlon), Rock Valley (after BV), Steps (after RV.) Overall goal to add substance to existing regions.

Statistics

Total Posts
General Information
  • Last Activity: Today 10:29 PM
  • Join Date: 08-07-2011

All times are GMT -8. The time now is 10:56 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.